logo

Knowledge

Contact Us

Disassembly Swimming Pool Maintenance

May 17, 2017

1. The disassembly of the overall swimming pool in each volume: 3-6 kg, the aggregate aluminum chloride into the plastic barrel add the appropriate amount of water to dissolve it, using the spoon in the pool evenly poured around the pond;

2. One times per 3 days (proportion: 1000M3 water: 3 kg); a Times per week (proportion: 1000M3 water: 6 kg);

3. Poly Aluminum Chloride delivery time: After the day of business;

4. About 6 hours after the delivery of polyaluminum chloride, sewage treatment is required;

5. Decontamination procedure:

A. Decontamination time: 5:30 A.M. to 11:30;

B. The disassembly of the whole swimming pool to inspect the suction pump's cables are intact;

C. Fixing the water pipe at the outlet of the sewage pump and tying the cable to the sewage pump with the water pipe;

D. Bind floating balls to water pipes, spacing between 1.5 meters and so on each ball;

E. Putting the suction pump into the pool and slowly pulling back and forth the sediment from the bottom of the pool, pulling back and forth the one-way speed control in 5-7 minutes, two-way control in 10-14 minutes, the decontamination time is about 4-6 hours.


Related Industry Knowledge
Product Show
Swimming Pool Covers
Manual Swimming Pool Covers
SPA Pool Covers
Automatic Swimming Pool Covers Inground
Automatic Swimming Pool Covers Above Ground
Contact information

No. 11, Gaolong industrial road, Huanzhuli village, Changping Town, Dongguan, Guangdong

Tel: 86-769-81098289

vio@swimmingpoolscover.com

QR Code

Copyright © Boree Mechanical and Electrical Equipment Co.,Ltd All Rights Reserved.